Technical Projects

Submitted the final road Geological Study

Submitted the final road Geological Study on the inner peripheral Thessaloniki (part Hortiatis-Trinity).

The studied etching is part of the planned external ring road of Thessaloniki which connects the Via Egnatia (in the Titan) to the Macedonia airport, route Thermi – Galatista and the highway Thessaloniki – Moudanion (line 59).

Older Posts Studies Submit Geological Suitability