Technical Projects

Submitted the final road Geological Study

Submitted the final road Geological Study on the inner peripheral Thessaloniki (part Hortiatis-Trinity). The studied etching is part of the planned external ring road of Thessaloniki which connects the Via Egnatia (in the Titan) to the Macedonia airport, route Thermi – Galatista and the highway Thessaloniki – Moudanion (line 59).

Technical Projects, Uncategorized

Hgoumenitsa

Under the Framework Agreement on the “Elaboration of geological – geotechnical studies for the needs of” Egnatia Odos SA “(Principal Axis Vertical Axis, Works Infrastructure Thessaloniki and other needs) – Ref. Reference 5279 “: Presented study” Reconnaissance geological study in the “Override Igoumenitsa”.